The Problem
Corps of Engineers determined that existing creek was jurisdictional waters of the U.S. The downstream existing residential development had a history of flooding problems prior to any development from this new condo site.
The Solution
I designed a detention pond facility that alleviated the flooding problem downstream and actually provided relief to the existing natural jurisdictional streams during large rainfall events. The streams were left in their natural state.